Where North Carolina has paused data centers
County and town actions on data centers: moratoriums adopted, ordinances passed, votes pending, and proposals rejected. Every row links to the meeting record or local report.
What the data shows
Local pauses on data centers spread quickly across North Carolina from late 2025 into 2026, mostly as twelve-month moratoriums while boards write zoning standards for the use. Some counties rejected a pause and some adopted an ordinance instead. The county pages and this tracker use the same checked records.
How to use it
Developers can see which jurisdictions have an active pause and which have written standards a project can meet. Reporters and planners can see the pattern by date. Landowners can see whether their county has acted.
How this dataset was built
Rows come from county and town meeting records, agendas, adopted ordinances, and local news reports of the votes. Each row carries a source check dated 2026.10.02. Dates are published only when the opened evidence supports them. A missing date remains blank. Moratoriums that cover only crypto mining are excluded. Actions we could not confirm on a live page are left out until we can.
Questions
Which North Carolina counties have a data center moratorium?
The table lists county, town, and tribal records confirmed in this check, with their current status and any confirmed end date. An end condition can end a pause before its date cap. Proposed actions, expired pauses, permanent bans, and replacement ordinances have separate statuses.
Does a moratorium stop every data center?
No. A moratorium pauses new applications for the period the board sets. Projects already approved usually continue, and courts have exempted individual projects from a later pause.
Can I reuse this data?
Yes. The dataset is licensed CC BY 4.0. Cite FOUND and link to this page.
The data
| Jurisdiction | County | Adopted | Status | In effect until | End condition | Next event | Area | What happened | Sources |
|---|---|---|---|---|---|---|---|---|---|
| Alamance County | Alamance | 2026.08.17 | in_effect | 2027.08.17 | Unincorporated county | The county adopted a one-year pause while it studies data-center rules. | [48][49] | ||
| Sparta | Alleghany | proposed | Proposed one-year pause | The September 1 agenda lists a public hearing on a one-year data-center moratorium. The hearing outcome remains unconfirmed. | [50] | ||||
| Beaufort County | Beaufort | vote_scheduled | Proposed one-year term from the effective date, per the draft ordinance in the 2026.10.05 agenda packet | 2026.10.05: Public hearing and vote on the proposed moratorium | all unincorporated areas of Beaufort County (proposed) | The county proposed a one-year pause on data-center development applications in its unincorporated areas. The hearing and vote are on the 2026.10.05 agenda, with the draft ordinance in the packet. | [14][51] | ||
| Elizabethtown | Bladen | proposed | Proposed one-year pause | Town limits and ETJ | The town proposed a one-year pause on data-center development approvals and advertised a June 15 hearing. Its outcome remains unconfirmed. | [52][53] | |||
| Boiling Spring Lakes | Brunswick | 2026.06.02 | in_effect | 2027.06.02 | Earlier approval of new data-center zoning regulations | City planning jurisdiction | The city paused data-center development approvals for one year, ending earlier if it adopts new zoning rules. | [8][54] | |
| Southport | Brunswick | 2026.09.10 | in_effect | 15 months or earlier adoption of UDO amendments for these uses | Town limits | The city adopted a 15-month pause on new data-center approvals while it develops zoning rules. It ends earlier if the city adopts UDO amendments for these uses. | [55][56][57] | ||
| Asheville | Buncombe | 2026.06.23 | in_effect | One-year pause | The city adopted a one-year pause on new data-center development under Ordinance 5238. | [58] | |||
| Black Mountain | Buncombe | 2026.05.11 | ordinance_adopted | Permanent zoning standards | The town adopted data-processing-center definitions, permitted uses and regulations. A possible moratorium draft was requested for future consideration. | [59] | |||
| Woodfin | Buncombe | 2026.05.19 | in_effect | The town's adopted-ordinance index lists Ordinance 2026-04 establishing a temporary pause on new data centers. | [60] | ||||
| Buncombe County | Buncombe | 2024.10.15 | ordinance_adopted | Permanent zoning amendment | The county board of commissioners approved a zoning text amendment addressing data centers and cryptocurrency mining on October 15, 2024, per the county planning review. | [61] | |||
| Weaverville | Buncombe | 2026.04.27 | ordinance_adopted | Permanent zoning text amendment | Town zoning jurisdiction | Town Council classed data centers and crypto mining as noxious uses on April 27, 2026, by a 6-0 vote. Noxious uses need a council-approved conditional district in the I-1 district. This is a permanent zoning rule, not a moratorium. | [62][63] | ||
| Hildebran | Burke | 2026.03.11 | ordinance_adopted | Permanent zoning standards | The town adopted conditional zoning standards for data centers and other critical digital infrastructure facilities. | [64] | |||
| Hildebran | Burke | 2026.08.24 | in_effect | Twelve-month term reported by news. The adopted ordinance text was not read. | The council adopted a temporary moratorium on development approvals for critical digital infrastructure facilities on August 24 by unanimous vote. | [65][66][67] | |||
| Camden County | Camden | 2026.08.03 | in_effect | 2027.01.03 | Earlier adoption of zoning amendments addressing these uses | Unincorporated county | The county adopted a five-month pause ending January 3, 2027, or earlier adoption of zoning amendments. | [15][68][69] | |
| Newport | Carteret | in_effect | At least one year | Town limits and ETJ | The town approved a pause lasting at least one year across its town and extraterritorial jurisdiction. | [70][16] | |||
| Chatham County | Chatham | 2026.02.11 | in_effect | 2027.02.11 | Earlier approval of new data-center zoning regulations | Unincorporated county | The county adopted a twelve-month pause on data-center development approvals, ending earlier if new zoning regulations are approved. | [71][1][72] | |
| Apex | Chatham | 2026.04.14 | in_effect | 2027.04.27 | Twelve-month pause effective April 28, 2026 | The town adopted a twelve-month pause effective April 28, 2026. Its official advisory-board page confirms the ongoing moratorium study. | [73][74][75] | ||
| Cary | Chatham | 2026.08.27 | in_effect | 18-month moratorium | The town adopted an eighteen-month pause on data-center development applications. | [76][77] | |||
| Eastern Band of Cherokee Indians | Cherokee | 2026.05.07 | permanent_ban | Indefinite moratorium | Tribal lands within Cherokee County | Tribal Council ratified Ordinance No. 158 in open Council on May 7, 2026. It prohibits data centers on EBCI Tribal lands and remains in effect indefinitely. | [78][79][80][81] | ||
| Cherokee County | Cherokee | proposed | The county did not adopt a data-center moratorium. A draft high-impact land use ordinance that covers data processing facilities went to the planning board, which reviewed it on July 14, 2026. | [82][83][17] | |||||
| Clay County | Clay | 2026.01.08 | permanent_ban | Permanent ordinance, effective on adoption | Unincorporated county outside municipal limits and extraterritorial jurisdictions | Ordinance No. 01.08.2026 prohibits commercial data centers with a peak power demand of 2 megawatts or more in every zoning district of the unincorporated county. It passed 5-0 on January 8, 2026, with no end date. | [18][19] | ||
| Kings Mountain | Cleveland | 2026.02.24 | extended | 2027.08.24 | Earlier termination by City Council based on progress or state or federal action | City planning jurisdiction | The initial pause began February 24, 2026. The city now states a cap of August 24, 2027, with earlier termination possible. | [20][84] | |
| Columbus County | Columbus | vote_scheduled | Proposed 120-day term from adoption, per the draft ordinance in the 2026.10.05 agenda packet (news reports said 90 days) | 2026.10.05: Public hearing on proposed data-center moratorium | unincorporated areas of Columbus County outside municipal extraterritorial jurisdictions (proposed) | Commissioners hold a 2026.10.05 hearing on a proposed 120-day pause on development approvals for data centers in the unincorporated county. The packet revised the term from the 90 days first reported. | [10][85][86] | ||
| Whiteville | Columbus | 2026.08.25 | in_effect | 2027.08.25 | Earlier adoption of a zoning ordinance text amendment covering the uses | The city adopted a twelve-month pause on data centers and cryptocurrency mining. It ends August 25, 2027, or when replacement zoning standards are adopted. | [9][87] | ||
| Cumberland County | Cumberland | 2026.06.15 | in_effect | Stated six-month duration, exact calendar end unconfirmed | The county approved a six-month data-center moratorium. Draft replacement standards were discussed September 15 and remain under review. | [21] | |||
| Cumberland County | Cumberland | proposed | 2026.10.20: Joint Planning Board meeting on the proposed data-center ordinance | Replacement data-center zoning standards presented September 15 remain proposed and unadopted. The county lists an October 20 Joint Planning Board meeting and a November public hearing. | [21] | ||||
| Fayetteville | Cumberland | rejected | City of Fayetteville | On August 10, 2026, a motion to reconsider a moratorium failed 5-5. The council sent draft data-center rules back to staff for late October. | [88][5][89] | ||||
| Davidson County | Davidson | rejected | The proposed temporary moratorium failed on a three-to-three vote on August 24. On September 28 the board passed a four-to-two motion to give staff direction on the moratorium, with no adoption recorded. | [22][23][24] | |||||
| Davie County | Davie | 2026.07.06 | in_effect | Stated twelve-month duration, exact calendar end unconfirmed | The county approved a one-year pause on data-center construction and development on July 6. The exact end date could not be confirmed. | [90] | |||
| Durham County | Durham | 2026.08.24 | in_effect | Stated nine-month duration, exact calendar end unconfirmed | The county approved a nine-month moratorium on accepting and processing applications for new or expanded data centers. | [91] | |||
| Durham | Durham | 2026.05.04 | extended | 2027.05.03 | Twelve-month total following June 15 extension | The city extended its initial pause on June 15, 2026. Its official planning notice states expiration May 3, 2027. | [92][5] | ||
| Cary | Durham | 2026.08.27 | in_effect | Stated eighteen-month duration, exact calendar end unconfirmed | Council adopted an eighteen-month pause on data-center development approvals. Smaller internal data-processing equipment is exempt. | [76][93] | |||
| Raleigh | Durham | vote_scheduled | Proposed six-month duration, ending earlier if replacement amendments are adopted | 2026.10.06: Public hearing on proposed data-center moratorium | City corporate limits and extraterritorial jurisdiction | Council scheduled an October 6 hearing on a proposed six-month pause for major data-center approvals. | [94][95] | ||
| Edgecombe County | Edgecombe | 2026.08.03 | in_effect | Stated two-year duration, exact calendar end unconfirmed | County zoning jurisdiction | The county adopted a two-year data-center moratorium on August 3. The exact calendar end date remains unconfirmed. | [5][96][97][98] | ||
| Forsyth County | Forsyth | rejected | Commissioners declined to advance a proposed six-month pause to a public hearing. The proposal did not create a county moratorium. | [99][100] | |||||
| King | Forsyth | 2026.09.08 | in_effect | Sixty-day term stated in the staff report. A twelve-month extension is under review. | 2026.10.05: Council considers setting a November 2 legislative hearing on a twelve-month extension | City of King zoning jurisdiction | The council adopted a sixty-day pause on data centers on September 8. On September 28 the planning board recommended a twelve-month extension by a five-to-zero vote. | [101][102][103] | |
| Franklin County | Franklin | 2026.07.13 | ordinance_adopted | The county approved UDO amendment 26-UDO-01 defining data centers and establishing review standards. This is a permanent zoning amendment. | [104] | ||||
| Kings Mountain | Gaston | 2026.02.24 | extended | 2027.08.24 | Earlier termination by City Council based on progress or state or federal action | City planning jurisdiction | The initial pause began February 24, 2026. The city now states a cap of August 24, 2027, with earlier termination possible. | [20][84] | |
| Gates County | Gates | 2025.12.17 | in_effect | The county's planning presentation confirms its adopted data-center moratorium. A proposed replacement amendment would prohibit data centers and still requires a hearing. | [26] | ||||
| Gates County | Gates | proposed | The Planning Board recommends a permanent data-center prohibition. Formal adoption still requires a public hearing and future county board action. | [26] | |||||
| Eastern Band of Cherokee Indians | Graham | 2026.05.07 | permanent_ban | Indefinite | Tribal lands in Graham County | Tribal Council ratified Ordinance No. 158 in open Council on May 7, 2026. It prohibits data centers on EBCI Tribal lands and remains in effect indefinitely. | [78][79][80][81] | ||
| Butner | Granville | 2026.07.02 | in_effect | 2027.01.08 | Council directed staff to prepare an extension to May 8, 2027, not yet adopted | Town limits and extraterritorial jurisdiction | The town adopted a six-month moratorium, Ordinance 26-07-01, after a July 2, 2026 hearing. It ends January 8, 2027. In September the council asked staff to prepare an extension to May 8, 2027. | [29][105][28] | |
| Granville County | Granville | proposed | Granville County zoning jurisdiction | The county chose zoning rules over a moratorium. Commissioners held a hearing on August 3, 2026, on an amendment that sends data centers through conditional zoning. Final adoption is not confirmed in county records. | [27] | ||||
| Creedmoor | Granville | proposed | City of Creedmoor | The city chose zoning rules over a moratorium. It held an August 4, 2026 hearing on a text amendment that defines data centers and sets standards. The outcome was not readable on the city site. | [106][28] | ||||
| Greensboro | Guilford | 2026.08.18 | in_effect | 2027.02.14 | A 180-day pause covers new data centers with projected electrical demand above 10 megawatts. | [107] | |||
| Guilford County | Guilford | proposed | 2026.10.15: Reported legislative public hearing on the proposed moratorium | unincorporated county | A 180-day data-center moratorium is proposed. A legislative public hearing is reported for October 15. | [108][109] | |||
| Halifax County | Halifax | vote_scheduled | 2026.10.19: Legislative hearing on a proposed data-center moratorium | Halifax County zoning jurisdiction | On September 8, 2026, commissioners voted 5-1 to hold a legislative hearing on a data-center moratorium at their October 19 meeting. | [30][25] | |||
| Harnett County | Harnett | 2026.05.04 | in_effect | 2027.05.03 | Unless otherwise rescinded or extended | unincorporated county | A one-year pause was adopted May 4. The stated expiration is May 3, 2027. | [110][111][112] | |
| Canton | Haywood | 2026.02.11 | in_effect | 12 months. Exact expiration date unconfirmed | A 12-month moratorium pauses new data centers and cryptocurrency mining. | [113][2] | |||
| Clyde | Haywood | 2026.04.16 | in_effect | 12 months from adoption on April 16, 2026. The ordinance states no calendar end date | Corporate limits of the Town of Clyde | The town approved a one-year data-center moratorium. | [114][6][115] | ||
| Eastern Band of Cherokee Indians | Haywood | 2026.05.07 | permanent_ban | Indefinite moratorium | Eastern Band of Cherokee Indians lands | Tribal Council ratified Ordinance No. 158 in open Council on May 7, 2026. It prohibits data centers on EBCI Tribal lands and remains in effect indefinitely. | [78][79][80][81] | ||
| Hendersonville | Henderson | 2026.09.03 | in_effect | 2027.09.02 | Expires at 11:59 p.m. on September 2, 2027, unless earlier ended by council | The city adopted a one-year pause on data-center building, zoning and special use permits. | [31][116][117] | ||
| Henderson County | Henderson | 2026.07.15 | ordinance_adopted | County land-development jurisdiction outside municipal ETJs, plus jurisdictions requesting county enforcement | The Land Development Code contains permanent standards for cryptocurrency mining operations and data centers. | [118][31] | |||
| Hertford County | Hertford | 2024.03.18 | ordinance_adopted | Permanent development ordinance provision | Heavy Industrial district | The county's Unified Development Ordinance, effective March 18, 2024, allows a data center only by special use permit in the Heavy Industrial district, with added standards. The provision remains in the ordinance as amended December 1, 2025. | [32] | ||
| Statesville | Iredell | 2026.09.14 | in_effect | 2027.03.13 | Or earlier on City Council approval of new regulations or policies for data centers | City of Statesville and its extraterritorial jurisdiction | Council approved the second reading September 14 on its consent agenda. The ordinance runs from September 14, 2026, to March 13, 2027, and excludes previously approved development. | [119][120][121][122] | |
| Jackson County | Jackson | 2026.08.18 | in_effect | One year. Exact expiration date unconfirmed | Minutes confirm unanimous adoption of a one-year moratorium August 18. The exact expiration and coverage were not stated in the opened minutes. | [47] | |||
| Eastern Band of Cherokee Indians | Jackson | 2026.05.07 | permanent_ban | Indefinite moratorium | Eastern Band of Cherokee Indians lands | Tribal Council ratified Ordinance No. 158 in open Council on May 7, 2026. It prohibits data centers on EBCI Tribal lands and remains in effect indefinitely. | [78][79][80][81] | ||
| Lee County | Lee | 2026.04.20 | ordinance_adopted | The adopted Unified Development Ordinance contains permanent data-center standards. | [123][5] | ||||
| Sanford | Lee | 2026.04.21 | ordinance_adopted | The adopted Unified Development Ordinance contains permanent data-center standards. | [123][5] | ||||
| Lincolnton | Lincoln | 2026.09.03 | in_effect | 2027.01.01 | City of Lincolnton | City Council adopted a moratorium on applications for data storage facilities on September 3, 2026, by a 3-1 vote. It ends January 1, 2027. | [124][125] | ||
| Franklin | Macon | 2026.07.06 | in_effect | Expires automatically twelve months after adoption on July 6, 2026, unless ended earlier or extended | town planning jurisdiction | The town adopted a one-year data-center moratorium. | [126][127][128][129] | ||
| Macon County | Macon | 2026.08.11 | ordinance_adopted | The county amended its high-impact land use ordinance to regulate data centers and server-based facilities. | [33][130][131] | ||||
| Highlands | Macon | 2026.08.20 | in_effect | Town of Highlands planning jurisdiction | Town commissioners approved a temporary data-center moratorium after a public hearing on August 20, 2026. The draft described a 12-month term. The adopted text and end date were not readable on the town site. | [34][132] | |||
| Hot Springs | Madison | 2026.07.13 | in_effect | 2027.07.13 | Earlier extension or termination by the Board of Aldermen | Town of Hot Springs planning and zoning jurisdiction | The town adopted a one-year moratorium on data centers and crypto mining on July 13, 2026. It expires July 13, 2027, unless the board extends or ends it earlier. | [133][134] | |
| McDowell County | McDowell | 2026.08.31 | in_effect | Six months. Exact expiration date unconfirmed | Commissioners approved a six-month pause on August 31. The exact end date was not stated in readable evidence. | [35][135][136] | |||
| Charlotte | Mecklenburg | 2026.06.08 | in_effect | 2026.11.05 | Earlier City Council approval of new data-center regulations or policies | 2026.10.12: Public hearing on extension of the current data-center moratorium | city limits and ETJ | Charlotte pauses data-center approvals through November 5, 2026, or earlier replacement rules. Council scheduled an October 12 hearing on a proposed extension. | [137][7][138][139][140] |
| Montgomery County | Montgomery | proposed | Draft term: one year from the effective date | County land-use and planning jurisdiction | A draft one-year moratorium was on the September 15, 2026 commissioners' agenda as a discussion item. It was not adopted. A moratorium needs a public hearing before adoption. | [141][142] | |||
| Spring Hope | Nash | 2026.05.04 | in_effect | One-year term, exact end date unconfirmed | Commissioners unanimously approved data-center resolution 2026-01 on May 4, 2026. The minutes describe a one-year pause. | [143][144][145] | |||
| Nash County | Nash | 2026.09.08 | in_effect | 2027.06.30 | Or earlier on approval of new zoning rules for these uses | Unincorporated Nash County | Commissioners adopted a moratorium on September 8, 2026, after a public hearing. It ends June 30, 2027, or earlier when the county adopts zoning rules for these uses. | [146][147][12] | |
| Nashville | Nash | 2026.08.04 | in_effect | 2027.07.23 | Or earlier on approval of new zoning regulations for these uses | Incorporated areas and planning jurisdiction of the Town of Nashville | Town Council adopted Ordinance 2026-23 on August 4, 2026, after its second public hearing. The ordinance states a term from July 23, 2026, to July 23, 2027. | [148][36][149] | |
| Bailey | Nash | 2026.05.18 | in_effect | 10-month term | Town of Bailey and its extraterritorial jurisdiction | Commissioners adopted a 10-month data-center moratorium by resolution on May 18, 2026, by a 3-1 vote. On June 15, 2026, they adopted an amended resolution that revised the data-center definition. | [150][151][152][149] | ||
| Northampton County | Northampton | 2026.05.04 | in_effect | 2029.01.04 | Through January 4, 2029, unless earlier terminated, extended or modified by the board | County jurisdiction | The county adopted a 32-month data-center pause on May 4, 2026. It runs through January 4, 2029. | [13][145][153][154] | |
| Orange County | Orange | 2026.04.21 | in_effect | One-year term, exact end date unconfirmed | County minutes confirm unanimous adoption of a one-year data-center moratorium April 21, 2026. | [155][156] | |||
| Orange County | Orange | proposed | 2026.11.04: Planning Board Ordinance Review Committee review of draft data-center standards | County planning jurisdiction | A planning memo for the October 6, 2026 board meeting sets a schedule for permanent data-center standards, with a hearing expected March 2027. | [156] | |||
| Durham | Orange | 2026.05.04 | extended | 2027.05.03 | Twelve-month total following June 15 extension | The city extended its initial pause on June 15, 2026. Its official planning notice states expiration May 3, 2027. | [92][5] | ||
| Hillsborough | Orange | 2026.05.27 | extended | 2027.05.27 | Or earlier on approval of new zoning regulations | Town limits, extraterritorial jurisdiction, and future planning area | The town adopted a 60-day moratorium on May 27, 2026. On June 22, 2026, the board extended it to May 27, 2027, or earlier approval of new zoning rules. | [157][158] | |
| Pasquotank County | Pasquotank | 2026.05.18 | in_effect | 2027.05.17 | Earlier approval of data-center zoning amendments | Unincorporated county outside municipal extraterritorial jurisdictions | The county pauses data-center permits until May 17, 2027, or earlier adoption of zoning amendments. | [37] | |
| Pasquotank County | Pasquotank | proposed | 2026.10.22: Planning Board meeting on the UDO project | Unincorporated county outside Elizabeth City limits and ETJ | The draft UDO proposes prohibiting data centers. County adoption remains required, and the proposed rule may change during review. | [38] | |||
| Perquimans County | Perquimans | proposed | Draft term of one year. The posted draft states September 8, 2026, through September 7, 2027, unless the board ends, extends or modifies it earlier | 2026.10.05: Public hearing on the data-center moratorium | Unincorporated county | The county posted a draft one-year data-center pause and set an October 5, 2026 public hearing. No adoption appears in the opened county records. | [159][160] | ||
| Farmville | Pitt | 2026.08.03 | in_effect | One-year term, exact end date unconfirmed | Town of Farmville and its extraterritorial jurisdiction | Farmville adopted a 12-month data-center pause on August 3, 2026, for the town and its extraterritorial jurisdiction. | [161][162][163] | ||
| Randolph County | Randolph | 2026.08.03 | ordinance_adopted | The county regulates data-processing facilities through its adopted UDO, amended August 3, 2026. The use requires HI-CD zoning. | [39] | ||||
| Richmond County | Richmond | ordinance_adopted | The current adopted UDO defines data centers and permits the use in its zoning table. The data-center provision adoption date remains unconfirmed. | [40] | |||||
| Rockingham County | Rockingham | proposed | The September 14, 2026 Planning Board agenda lists proposed data-processing facility standards. County adoption remains unconfirmed. | [41][164] | |||||
| Rowan County | Rowan | 2026.05.04 | in_effect | 2027.05.04 | Earlier termination by majority-vote resolution of the Board of Commissioners | County zoning jurisdiction | The county adopted a one-year data-center moratorium on May 4, 2026. It expires no later than May 4, 2027, unless the board ends it earlier by resolution. | [165][166] | |
| Salisbury | Rowan | 2026.06.02 | ordinance_adopted | City Council approved data-storage facility zoning amendments June 2, 2026. | [42] | ||||
| Stokes County | Stokes | rejected | Commissioners rejected a six-month data-center moratorium in July 2026. | [11][167][168] | |||||
| King | Stokes | 2026.09.08 | in_effect | Sixty days from adoption, unless ended earlier or extended by the council | 2026.10.05: Council considers setting a November 2 hearing on a 12-month extension | City limits and extraterritorial jurisdiction | The council adopted a 60-day pause on data centers and related uses on September 8, 2026. Staff and the Planning Board recommend a 12-month extension. | [101][102] | |
| Surry County | Surry | 2026.06.01 | extended | 2028.07.20 | All areas subject to Surry County zoning authority and jurisdiction | The county extended its original June 1 pause on July 20, 2026. The published expiration is July 20, 2028. | [169] | ||
| Mount Airy | Surry | 2026.07.16 | extended | 60 days from July 16, 2026, plus a 90-day extension approved September 14, 2026 | Areas subject to city zoning authority | The city adopted a 60-day data-center pause on July 16, 2026. A city staff report states that a 90-day extension was approved September 14, 2026. | [170] | ||
| Mount Airy | Surry | proposed | 2026.10.15: Public hearing on proposed data-center ordinance | The city scheduled an October 15 hearing on permanent data-center rules that the Planning Board recommends. | [171][172] | ||||
| Swain County | Swain | 2026.04.21 | in_effect | 12-month term, exact calendar expiration not confirmed | unincorporated county | Swain County adopted a 12-month pause on new data centers in April 2026. | [6][173] | ||
| Eastern Band of Cherokee Indians | Swain | 2026.05.07 | permanent_ban | Indefinite | Lands of the Eastern Band of Cherokee Indians | Tribal Council ratified Ordinance No. 158 in open Council on May 7, 2026. It prohibits data centers on EBCI Tribal lands and remains in effect indefinitely. | [78][79][80][81] | ||
| Brevard | Transylvania | 2026.03.16 | expired | 2026.07.02 | Brevard adopted a temporary pause in March. Its stated July 2, 2026 expiration has passed. | [174][175][176][177] | |||
| Brevard | Transylvania | 2026.05.18 | ordinance_adopted | Ordinance 2026-19 established data-center definitions and land-use regulations. | [174][175] | ||||
| Waxhaw | Union | 2026.08.11 | in_effect | 2027.08.10 | Earlier adoption of data-center regulations or termination by the Board | Town of Waxhaw | The town adopted a twelve-month data-center pause on August 11, 2026. It ends no later than August 10, 2027. | [178] | |
| Union County | Union | proposed | An August 17 agenda proposed permanent data-center and cryptomining standards. The available official item has no recorded final action. | [179] | |||||
| Indian Trail | Union | proposed | The September 15 planning packet proposed data-center definitions and standards under amendment ZT 2026-0095. Council adoption remains unconfirmed. | [43] | |||||
| Vance County | Vance | 2026.09.14 | in_effect | 2026.11.13 | Or earlier on adoption of data-center zoning amendments | Vance County land use jurisdiction | Commissioners adopted a 60-day data-center moratorium on September 14, 2026, by a 5-2 vote. It ends November 13, 2026, or earlier when new data-center zoning rules are adopted. | [180][44] | |
| Apex | Wake | 2026.04.14 | in_effect | 2027.04.27 | Twelve-month pause effective April 28, 2026 | The town adopted a twelve-month data-center pause on April 14, 2026, effective April 28. Public reporting states expiration April 27, 2027. | [73][74][4][5] | ||
| Cary | Wake | 2026.08.27 | in_effect | 18-month moratorium | Independent reports confirm an eighteen-month pause adopted August 27, 2026. No exact calendar expiration was stated. | [76][77][5] | |||
| Durham | Wake | 2026.05.04 | extended | 2027.05.03 | Twelve-month total following June 15 extension | The city extended its initial pause on June 15, 2026. Its official planning notice states expiration May 3, 2027. | [92][5] | ||
| Holly Springs | Wake | 2026.06.16 | in_effect | Up to twelve months, exact calendar expiration not confirmed | town limits and ETJ | The town approved a pause of up to twelve months on June 16, 2026. Town limits and the ETJ are covered. | [181][182][183] | ||
| Wendell | Wake | 2026.04.13 | in_effect | 2026.12.31 | Earlier approval of new zoning regulations for these uses | Incorporated areas and planning jurisdiction | The town adopted a data-center pause on April 13, 2026. It runs through December 31, 2026, or until new zoning rules are approved. | [5][77][184][185] | |
| Raleigh | Wake | vote_scheduled | Proposed six-month pause | 2026.10.06: Public hearing and possible council vote | Raleigh planning jurisdiction (proposed) | The city council holds a 2026.10.06 evening hearing on a proposed six-month pause on development approvals for larger data centers in its planning jurisdiction. Council may vote the same night. | [94][186] | ||
| Warren County | Warren | proposed | Official planning materials describe a proposed moratorium and permanent data-center standards. Adoption following the August 19 hearing remains unconfirmed. | [46][45] | |||||
| Boone | Watauga | 2026.03.23 | in_effect | One-year term, exact calendar expiration not confirmed | town limits | The town approved a one-year data-center and cryptocurrency-mining pause on March 23, 2026. Its exact calendar expiration was not stated. | [187][188][189] | ||
| Watauga County | Watauga | 2026.04.21 | in_effect | One-year term | County commissioners unanimously passed a one-year moratorium on data centers and crypto mining on April 21, 2026, separate from the Town of Boone's. | [3][188][190] | |||
| Wilson | Wilson | 2026.05.21 | in_effect | Twelve-month term, ending earlier if permanent zoning regulations are adopted. Exact calendar expiration unconfirmed | Incorporated areas and planning jurisdiction of the City of Wilson | Wilson adopted a twelve-month data-center moratorium on May 21, 2026. It pauses new applications and ends earlier upon permanent zoning regulations. | [191][192] | ||
| Yadkin County | Yadkin | 2026.08.17 | in_effect | Two-year term, exact calendar expiration not confirmed | unincorporated county | Independent reporting confirms a two-year pause in unincorporated areas. An exact calendar expiration was not stated. | [193][194] | ||
| Jonesville | Yadkin | proposed | The town's September 28 meeting notice included a resolution to schedule a hearing on a temporary data-center moratorium. The outcome remains unconfirmed. | [195] |
Cite this dataset
FOUND, "Where North Carolina has paused data centers", lotsfound.com, 2026. Data from public sources listed below. Licensed CC BY 4.0.
Free to reuse with attribution to FOUND and a link to this page (CC BY 4.0).
Sources
- Chatham County public record
- Canton public record
- Watauga County public record
- Apex public record
- Wendell public record
- Swain County public record
- Charlotte public record
- Boiling Spring Lakes public record
- Whiteville public record
- Columbus County public record
- Stokes County public record
- Nash County public record
- Northampton County public record
- Beaufort County public record
- Camden County public record
- Newport public record
- Cherokee County public record
- Clay County public record
- Clay County public record
- Kings Mountain public record
- Cumberland County public record
- Davidson County public record
- Davidson County public record
- Davidson County public record
- Halifax County public record
- Gates County public record
- Granville County public record
- Creedmoor public record
- Butner public record
- Halifax County public record
- Henderson County public record
- Hertford County public record
- Macon County public record
- Highlands public record
- McDowell County public record
- Nashville public record
- Pasquotank County public record
- Pasquotank County public record
- Randolph County public record
- Richmond County public record
- Rockingham County public record
- Salisbury public record
- Indian Trail public record
- Vance County public record
- Warren County public record
- Warren County public record
- Jackson County public record
- Alamance County public record
- Alamance County public record
- Sparta public record
- Beaufort County public record
- Elizabethtown public record
- Elizabethtown public record
- Boiling Spring Lakes public record
- Southport public record
- Southport public record
- Southport public record
- Asheville public record
- Black Mountain public record
- Woodfin public record
- Buncombe County public record
- Weaverville public record
- Weaverville public record
- Hildebran public record
- Hildebran public record
- Hildebran public record
- Hildebran public record
- Camden County public record
- Camden County public record
- Newport public record
- Chatham County public record
- Chatham County public record
- Apex public record
- Apex public record
- Apex public record
- Cary public record
- Wendell public record
- Eastern Band of Cherokee Indians public record
- Eastern Band of Cherokee Indians public record
- Eastern Band of Cherokee Indians public record
- Eastern Band of Cherokee Indians public record
- Cherokee County public record
- Cherokee County public record
- Kings Mountain public record
- Columbus County public record
- Columbus County public record
- Whiteville public record
- Fayetteville public record
- Fayetteville public record
- Davie County public record
- Durham County public record
- Durham public record
- Cary public record
- Raleigh public record
- Raleigh public record
- Edgecombe County public record
- Edgecombe County public record
- Edgecombe County public record
- Forsyth County public record
- Forsyth County public record
- King public record
- King public record
- King public record
- Franklin County public record
- Butner public record
- Creedmoor public record
- Greensboro public record
- Guilford County public record
- Guilford County public record
- Harnett County public record
- Harnett County public record
- Harnett County public record
- Canton public record
- Clyde public record
- Clyde public record
- Hendersonville public record
- Hendersonville public record
- Henderson County public record
- Statesville public record
- Statesville public record
- Statesville public record
- Statesville public record
- Sanford public record
- Lincolnton public record
- Lincolnton public record
- Franklin public record
- Franklin public record
- Franklin public record
- Franklin public record
- Macon County public record
- Macon County public record
- Highlands public record
- Hot Springs public record
- Hot Springs public record
- McDowell County public record
- McDowell County public record
- Charlotte public record
- Charlotte public record
- Charlotte public record
- Charlotte public record
- Montgomery County public record
- Montgomery County public record
- Spring Hope public record
- Spring Hope public record
- Northampton County public record
- Nash County public record
- Nash County public record
- Nashville public record
- Bailey public record
- Bailey public record
- Bailey public record
- Bailey public record
- Northampton County public record
- Northampton County public record
- Orange County public record
- Orange County public record
- Hillsborough public record
- Hillsborough public record
- Perquimans County public record
- Perquimans County public record
- Farmville public record
- Farmville public record
- Farmville public record
- Rockingham County public record
- Rowan County public record
- Rowan County public record
- Stokes County public record
- Stokes County public record
- Surry County public record
- Mount Airy public record
- Mount Airy public record
- Mount Airy public record
- Swain County public record
- Brevard public record
- Brevard public record
- Brevard public record
- Brevard public record
- Waxhaw public record
- Union County public record
- Vance County public record
- Holly Springs public record
- Holly Springs public record
- Holly Springs public record
- Wendell public record
- Wendell public record
- Raleigh public record
- Boone public record
- Watauga County public record
- Boone public record
- Watauga County public record
- Wilson public record
- Wilson public record
- Yadkin County public record
- Yadkin County public record
- Jonesville public record
Tell us what the project needs
Load, acreage, counties, and timeline. We reply with how we would run the search and where we would start.