Data centers use water mainly to move heat out of the building. How much depends on the cooling design, and the design depends partly on what the site's water system can supply.

See how we check water and sewer

Quick summary: This guide explains why data centers use water, how cooling designs trade water against electricity, and what a site needs from its water and sewer provider. It is for landowners, residents, and buyers who weigh a site. The key point: most of the water carries heat out of the building, the cooling design sets how much, and the provider decides what the site can supply.

Why a data center uses water

A data center uses water mainly to carry heat away from its servers. Servers turn electricity into heat. The building has to move that heat outside, day and night. Evaporating water carries away a lot of heat. See DOE cooling-water guidance.

Power plants that serve the grid also use water for cooling. See EIA power-plant cooling guidance. That use is not on the site’s water bill, but it is part of the public debate.

How cooling designs differ

Cooling designs differ in water use and electricity use. The trade depends on the equipment, operating temperature, and climate.

  • Evaporative cooling. Cooling towers or evaporative units lose water to the air as they work. They consume water and can reduce cooling electricity. They also drain concentrated water, called blowdown, for treatment, reuse, or permitted discharge.
  • Closed-loop cooling. Water or coolant circulates in a sealed loop. The loop needs little makeup water once it is filled, but the outdoor equipment can still use cooling towers that consume water.
  • Air-cooled systems. Fans and chillers reject heat to the air with little or no water. Electricity use depends on the design and the outdoor temperature.
  • Liquid cooling. Coolant runs to the chips or the racks. It moves heat well, but the heat still has to leave the building, through evaporative or dry equipment.

Many campuses combine designs. Federal design guidance tells designers to reject as much heat as possible through dry coolers. A dry cooler’s output depends on the outdoor air temperature, and some designs add water sprays to air-cooled equipment to improve heat rejection. See DOE cooling-design guidance. The design choice belongs to the buyer’s mechanical engineer, and it changes what the site must supply. See Data center cooling systems and what they ask of a site.

The short version: The cooling design sets the water demand. Evaporative towers consume water and drain blowdown, while dry equipment uses little water. Ask which design a buyer plans before you judge a site’s water.

Why water became a public concern

Residents, farms, and industry share the same rivers, reservoirs, and aquifers. A large new user raises fair questions. Will it strain the supply in a drought? Will it raise rates? Will it disclose how much it uses?

Those questions now come up at public hearings. North Carolina boards have discussed water-use standards in proposed data-center rules. See a county’s draft review and Are data centers bad? The objections, checked against the record. See How to read a data-center moratorium and The neighbors decide more sites than the zoning map.

What water means for choosing a site

Water system capacity. The provider must confirm whether its supply, treatment plant, and mains can carry the proposed demand, and state the terms in writing. Start with What a will-serve letter is, and what it is worth.

Reclaimed water. Some wastewater plants produce treated water suitable for cooling. A site near a reclaimed-water line may draw less on drinking water. Whether the provider offers it, in what amount, and at what quality is the provider’s answer. See Reclaimed water: what it is and why large users want it.

Wastewater discharge. When cooling-tower blowdown goes to the sewer, the provider must accept both the volume and the chemistry. See NCDEQ pretreatment guidance. Sewer capacity can limit a site as much as water supply.

Local rules on cooling. A county or town may require water-use disclosure or favor closed-loop or dry equipment in its ordinance or permit conditions.

Wells and streams. A site without public water may look to groundwater or a stream. State water-withdrawal and water-use rules can cover the proposed well or stream intake. See NCDEQ withdrawal and water-use rules. An engineer and a water attorney identify which rules cover the proposed withdrawal. See Riparian rights: what a landowner may do with water on the land.

What the public record shows

Public records show water and sewer lines in many areas, service boundaries, treatment plant locations, and ordinance text. They cannot show spare capacity, the provider’s willingness to serve, or the rate for a large user. We read what the record holds and mark what it does not. See A water system nearby is not water for your project.

Take action: If you own land near water and sewer lines, find out how the record reads it before a buyer asks the provider. Start with Is your land a data-center site?

Who confirms it

The water and sewer provider confirms capacity and terms. The buyer’s mechanical engineer confirms how much water a given design needs. A civil engineer confirms how the site connects.

Key recap

  • A data center uses water mainly to move server heat out of the building, and evaporation carries away a lot of heat.
  • The cooling design sets the water demand: evaporative towers consume water, while dry coolers and air-cooled chillers use little.
  • A closed loop or liquid cooling still has to reject heat outdoors, and that equipment decides the water use.
  • Power plants that serve the grid also use water for cooling, apart from the site’s water bill.
  • The water and sewer provider confirms capacity and terms, including whether the sewer can take cooling-tower blowdown.

Questions

Do all data centers use a lot of water?

No. Water use depends on the cooling design and the climate. Dry heat rejection can use far less water. A closed loop can still reject heat through an evaporative tower, and electricity use depends on the whole design.

Can a landowner find out if water is available for a data center?

An owner can ask the provider about nearby lines and general capacity. A detailed answer usually follows a formal request that states the buyer’s expected demand.

What is blowdown?

Blowdown is water drained from a cooling tower to control the minerals that evaporation leaves behind. If discharged to a sewer, it counts against the capacity and must meet the provider’s acceptance terms.